villaindiana.blogg.se

Pikka pikka hair
Pikka pikka hair





pikka pikka hair

Seeing my childish behavior, bhai chuckled and seeing him like this, my pout converted into a smile itself. You really made me wait for a very long time"Īfter parting from him, I said and pouted. īhai also return my hug with same warmth, and I feel him kissing on my hair. I literally shouted in a very high pitch voice, out of excitement and happiness and directly run towards him, and engulfed him in a very tight warm hug. Just as I moved aside, I saw Bhai was coming from inside. " Can't they go from another side.?" I thought to myself.īut nontheless, without saying anything, I moved aside and give them space to move. Said the man from behind the man who was staring at me intensely.

pikka pikka hair

"Miss can you plz give us some space to move" Not able to look into those ocean deep eyes, I averted my gaze from him, and looked confusingly to the person, who was speaking to me. I felt like he was trying to figure out the web of my mind. I look up and my eyes met with the most beautiful chocolate brown eyes, which were already staring at me very intensely. I heard someone's voice and the chain of my thoughts broke down instantly.

pikka pikka hair

I just ignored it and started thinking why Bhai is taking so much time to arrive. I saw that man coming towards my direction. "Wait, why I am even complimenting him?" I thought to my self. This includes an increase of 40 million bbl (gross) to 767.6 million barrels (gross) 2C contingent resource increase within the Pikka Unit and a gross booking of 200.2 million bbl of 2C contingent resources in the Quokka (Mitquq) and Horseshoe (Stirrup) trends.As soon as I listen this voice from a very handsome man, I quickly shut my mouth as fast as I can. The company noted also a 33% increase in 2C contingent resources in its Alaskan North Slope acreage to a gross of 968 million bbl from 728 million bbl, of which 494 million bbl is net to Oil Search. It intends to sell 15-51% of its interest in Pikka and other Alaskan assets.

pikka pikka hair

Oil Search plans to launch a formal divestment process in first-quarter 2021, either solely or in cooperation with JV partner Repsol. Works also included construction of the Pikka B drill site, the production facility and operations center pads, a 58-m long bridge over the Miluveach River, and an 18.5-km gravel road. This year Oil Search completed civil works for road construction to Pikka drill site B.

#PIKKA PIKKA HAIR PLUS#

The design enables Pikka field to be brought on stream with a facility that meets the original processing requirements plus the ability to add capacity during subsequent phases. Following detailed engineering and value optimization studies this year, costs savings have been achieved by using a modular, truckable process facility design with standardized equipment. Oil will be produced at a breakeven cost of supply of less than $40/bbl, it said. Oil Search says the slimmed down initial project cost is expected to be less than $3 billion. A final investment decision is expected by late 2021 leading to first oil production in 2025. The initial project will be based on a single drill site development with a production capacity of 80,000 b/d. The Oil Search Ltd.-operated joint venture on the North Slope of Alaska is preparing to enter the front-end engineering and design (FEED) stage for its proposed Pikka Phase 1 oil development early in 2021.







Pikka pikka hair